| ||||||||||||||||||||||||||||||||||||||||||||||||
颁布日期:19830101 实施日期:19830101 1. MARKING OF MAXIMUM GROSS CONTAINER WEIGHT ANNEX1 I, Regulation 1, paragraph 1 Safety Approval Plate Letter the existing paragraph 1 as sub-paragraph 1 (a) and add thefollowing new paragraphs: “(b) on each container for which the construction is commenced onor after 1 January 1984 all maximum gross weight markings on the containershall be consistent with the maximum gross weight information on theSafety Approval Plate. (c) On each container for which the construction was commencedbefore 1 January 1984 all maximum gross weight markings on the containershall be made consistent with the maximum gross weight information on theSafety Approval Plate not later than 1 January 1989.“ 2. MARKINGS FOR HANDLING EMPTY CONTAINERS Annex II-Construction delete paragraph 3 3. STACKING TEST FOR TANK CONTAINERS ANNEX II, TEST NO. 2 `STACKING' Add under the heading “Internal loading” and after the words “……equal to 1.8R.” the following new sentence: “Tank containers may be tested in the tare2 condition.” 4. LONGITUDINAL RESTRAINT (STATIC TEST) FOR TANK CONTAINERS ANNEX II, TEST NO. 5 Add under “Internal loading” and after the words “…… or rating, R.”the following new sentence: “In the case of a tank container, when the weight of the internalload plus the tare is less than the maximum gross weight or rating, R, asupplementary load is to be applied3 to the container.” 5. APPROVED CONTINUOUS EXAMINATION PROGRAMME ANNEX I, Regulation 2 Replace existing paragraphs 2, 3 and 4 with the following: “2 (a) The owner of an approved container shall examine the containeror have it examined in accordance with the procedure either prescribed orapproved by the Contracting Party concerned, at intervals4 appropriate tooperating conditions. (b) The date (month and year) before which a new container shallundergo its first examination shall be marked on the Safety ApprovalPlate. (c) The date (month and year) …… (continue as for previousparagraph 3)。 (d) (As previous paragraph 4, except for `24 months' to read `30months')。 3 (a) As an alternative to paragraph 2, the Contracting Partyconcerned may approve a continuous examination programme if satisfied, onevidence submitted by the owner, that such a programme provides a standardof safety not inferior to the one set out in paragraph 2 above. (b) To indicate that the container is operated under an approvedcontinuous examination programme, a mark showing the letters `ACEP' andthe identification of the Contracting Party which has granted approval ofthe programme shall be displayed on the container on or as close aspracticable to the Safety Approval Plate. (c) All examinations performed under such a programme shalldetermine whether a container has any defects which could place any personin danger. They shall be performed in connexion with a major repair,refurbishment, or on-hire/off-hire interchange and in no case less thanonce every 30 months. (d) As a transitional provision any requirements for a mark toindicate that the container is operated under an approved continuousexamination programme shall be waived5 until 1 January 1987. However, anadministration may make more stringent6 requirements for the containers ofits own (national) owners.“ Renumber the existing paragraph 5 as paragraph 4. 点击收听单词发音
|
||||||||||||||||||||||||||||||||||||||||||||||||
- 发表评论
-
- 最新评论 进入详细评论页>>