| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
China's million-kilowatt generating unit for the Baihetan hydropower project has seen its last core component1, the water distributor, completed.
中国白鹤滩水电站百万千瓦发电机组最后的核心部件水轮机完工。
The distributor weighed more than 870 tonnes and was developed by Dongfang Electric Machinery2 Co., Ltd. in southwest China's Sichuan Province, a leading Chinese electric machinery maker3.
As a key part of controlling the direction and volume of water inflow, the distributor has met high technical targets in terms of vertical4 gap and end gap of guide vanes and concentricity, the company said.
Based on the successful experience of the construction of large hydropower plants such as the Three Gorges5 and Xiluodu, Dongfang Electric Machinery has made a series of technological6 innovations to improve product performance, reliability7 and expected service life.
Gate leakage8 has been reduced to a tenth of the normal level to avoid significant losses in efficiency. The 0.05-mm concentricity of the installation was also above top-quality standards, the company said.
On the Jinsha River, an upper section of the Yangtze, the Baihetan dam is the second largest after the Three Gorges project in central Hubei Province in terms of installed capacity.
点击收听单词发音
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
上一篇:中国开展全国节能宣传周活动 下一篇:北京大兴机场高速预计月底完工 |
TAG标签:
water
plants
hydropower
- 发表评论
-
- 最新评论 进入详细评论页>>